What are the requirements for a loft installation?
Boiler installations in roof spaces should comply with the following additional requirements:-
Enough vertical clearance should be provided to satisfy the static head requirements for an open vented system.
Fixed flooring should be provided under and around the boiler for servicing.
A permanent means of access to the roof space should be provided e.g fixed, retractable loft ladder
Fixed lighting should be provided.
A guard should be provided to prevent contact between stored articles and the appliance.
The exit from the roof space should be provided with a guard rail to prevent anyone falling
Isolation of gas, water and electricity should be possible without entering the roof space

<< Back to top

Can I fill a system with softened water?
Water supplied via a water softener should not be used to fill any central heating system unless a corrosion inhibitor specifically formulated for the purpose has been added.

Because the chemical composition of softened water is very variable, we recommend that filling a system with it should be avoided by turning off the softener whilst the system is filled, if possible.

Due to the varied type of water softeners and water quality it is always recommended to contact a water treatment specialist.

<< Back to top

Why is system flushing important?
Flushing of a central heating system in accordance with BS 7593 is carried out to remove contaminants such as flux residues, grease, jointing compounds, oxides produced by the corrosion process, bacteria and in hard water areas limescale.

If they are not removed, these contaminants form a harmful sludge in the system which reduces the efficiency of the system, causes noise and could potentially reduce the useful life of the appliance.

<< Back to top

Do I need to fit a bypass?
On open vented models, a bypass circuit, 3m long and incorporating an automatic bypass valve will be required.

On combi and sealed system models that are supplied with an integral bypass, an external automatic system bypass may still be required if there is any doubt that the minimum flow rate as specified in the installation instructions will be maintained at all times.

The above requirements are in line with CheSS best practice.

<< Back to top

       
  Head Office 01773 824639  
  Literature 01773 596190  
  After sales 01773 828100  
  Clearly Solar
After sales
01773 596510
 
 
  Technical help 01773 828300  
  Training 01773 596156  
  Spare parts 01773 596020